{"id":16874,"date":"2026-11-18T08:34:05","date_gmt":"2026-11-18T08:34:05","guid":{"rendered":"https:\/\/www.lawayala.com\/resources\/business-litigation\/notice-of-commencement-florida-lien-rights\/"},"modified":"2026-11-18T08:34:11","modified_gmt":"2026-11-18T08:34:11","slug":"notice-of-commencement-florida-lien-rights","status":"publish","type":"page","link":"https:\/\/www.lawayala.com\/resources\/business-litigation\/notice-of-commencement-florida-lien-rights\/","title":{"rendered":"Notice of Commencement Hillsborough County: Lien Guide"},"content":{"rendered":"\n<div class=\"wp-block-cover alignfull is-dark chg-hero\" style=\"min-height:460px;aspect-ratio:unset;\"><span aria-hidden=\"true\" class=\"wp-block-cover__background has-background-dim-80 has-background-dim wp-block-cover__gradient-background has-background-gradient\" style=\"background:linear-gradient(90deg,rgba(32,36,46,1) 0%,rgba(32,36,46,1) 55%,rgba(32,36,46,0.7) 100%)\"><\/span><img class=\"wp-block-cover__image-background wp-image-16872\" alt=\"Certified-mail envelope marked &quot;notice of breach&quot; beside a purchase order and calendar with a circled deadline.\" src=\"https:\/\/www.lawayala.com\/resources\/wp-content\/uploads\/2026\/11\/certified-mail-envelope-marked-notice-of-breach-beside-a-pur-photo-13.jpg\" width=\"1376\" height=\"768\" srcset=\"https:\/\/www.lawayala.com\/resources\/wp-content\/uploads\/2026\/11\/certified-mail-envelope-marked-notice-of-breach-beside-a-pur-photo-13-150x150.jpg 150w, https:\/\/www.lawayala.com\/resources\/wp-content\/uploads\/2026\/11\/certified-mail-envelope-marked-notice-of-breach-beside-a-pur-photo-13-300x167.jpg 300w, https:\/\/www.lawayala.com\/resources\/wp-content\/uploads\/2026\/11\/certified-mail-envelope-marked-notice-of-breach-beside-a-pur-photo-13-768x429.jpg 768w, https:\/\/www.lawayala.com\/resources\/wp-content\/uploads\/2026\/11\/certified-mail-envelope-marked-notice-of-breach-beside-a-pur-photo-13-1024x572.jpg 1024w, https:\/\/www.lawayala.com\/resources\/wp-content\/uploads\/2026\/11\/certified-mail-envelope-marked-notice-of-breach-beside-a-pur-photo-13.jpg 1376w\" sizes=\"(max-width: 825px) 825px, 100vw\" fetchpriority=\"high\" decoding=\"async\"\/><div class=\"wp-block-cover__inner-container has-global-padding is-layout-constrained wp-block-cover-is-layout-constrained\">\n<p class=\"chg-eyebrow has-base-color has-text-color wp-block-paragraph\" style=\"text-shadow:0 1px 3px rgba(0,0,0,0.6),0 0 18px rgba(0,0,0,0.35)\">Construction Litigation | Tampa, Hillsborough County<\/p><h1 class=\"wp-block-heading has-base-color has-text-color\" style=\"text-shadow:0 1px 3px rgba(0,0,0,0.6),0 0 18px rgba(0,0,0,0.35)\">Notice of Commencement in Hillsborough County: A Plain-Language Lien Guide<\/h1><p class=\"has-base-color has-text-color wp-block-paragraph\" style=\"font-size:clamp(0.875rem, 0.875rem + ((1vw - 0.2rem) * 0.625), 1.25rem);text-shadow:0 1px 3px rgba(0,0,0,0.6),0 0 18px rgba(0,0,0,0.35)\">Learn what this recorded filing shows, how to look it up in county records, and why it matters when a construction payment dispute arises.<\/p><div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\"><div class=\"wp-block-button chg-cta chg-cta-call\"><a class=\"wp-block-button__link wp-element-button\" href=\"tel:+18134145715\">Book a Case Evaluation<\/a><\/div><div class=\"wp-block-button chg-cta chg-cta-form\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/www.lawayala.com\/contact\/\">Book a Case Evaluation<\/a><\/div><\/div>\n<\/div><\/div>\n\n\n<p class=\"wp-block-paragraph\" style=\"font-size:0.85rem;color:#6b7280;margin-bottom:1.5rem\">By Eduardo A. Maura \u00b7 Published November 18, 2026<\/p>\n\n<article lang=\"en\">\n\n\n<p>This guide explains the notice of commencement for Hillsborough County projects. It covers what the document is, how it affects lien rights, and where to find a recorded copy. Owners, contractors, subcontractors, and suppliers in Tampa, Brandon, Riverview, Plant City, and Temple Terrace all run into it.<\/p>\n<h2>What Is a Notice of Commencement in Florida?<\/h2>\n<p>Florida&#8217;s construction lien law sits in <a href=\"https:\/\/www.leg.state.fl.us\/statutes\/index.cfm?App_mode=Display_Statute&amp;URL=0700-0799\/0713\/Sections\/0713.13.html\">Chapter 713 of the Florida Statutes<\/a>. That chapter covers notices to owner, claims of lien, deadlines, and lien foreclosure.<\/p>\n<p>It isn&#8217;t the same as a building permit. A permit is approval from the local permitting office to do the work. The notice is a record that ties a project to a specific property and owner, and it states an expiration date. People mix the two up because both often run through the same local paperwork process.<\/p>\n<p>Most readers meet a notice in one of three ways. An owner may have signed one. A contractor may have asked for a copy. A subcontractor or supplier may have found one while checking a job&#8217;s records. Each person has a different stake in what the notice says.<\/p>\n\n<div class=\"cta-dose-mid wp-block-group has-contrast-color has-surface-background-color has-text-color has-background has-global-padding is-layout-constrained wp-container-core-group-is-layout-32197852 wp-block-group-is-layout-constrained\" style=\"background-color:var(--wp--preset--color--surface,#f2f3f5);color:var(--wp--preset--color--contrast,#22252b);border-radius:8px;padding-top:1.5rem;padding-bottom:1.5rem;padding-left:1.5rem;padding-right:1.5rem;border-left:6px solid var(--wp--preset--color--cta,currentColor);box-shadow:0 2px 10px rgba(0,0,0,0.18)\">\n<p class=\"wp-block-paragraph\">If an unfamiliar notice has turned up on a project you own, pay for, or work on, our team can talk through the facts with you. Talk it through with our team &#8212; we can walk you through how a situation like yours is usually handled and what your options are.<\/p><div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\"><div class=\"wp-block-button chg-cta-call\"><a class=\"wp-block-button__link wp-element-button\" href=\"tel:+18134145715\">Schedule a consultation<\/a><\/div><div class=\"wp-block-button chg-cta-form\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/www.lawayala.com\/contact\/\">Schedule a consultation<\/a><\/div><\/div>\n<\/div>\n<h2>When Does a Notice of Commencement Apply?<\/h2>\n<p>Florida&#8217;s lien law sets out which projects a notice covers. You&#8217;ll find those terms in <a href=\"http:\/\/www.leg.state.fl.us\/statutes\/index.cfm?App_mode=Display_Statute&amp;URL=0700-0799\/0713\/0713ContentsIndex.html\">Chapter 713<\/a>. Reviewing the actual wording of any contract or notice, rather than a summary, can help you understand what applies to your project.<\/p>\n<p>Take a homeowner in Brandon who adds a bedroom and hires a general contractor. The contractor may ask whether a notice has been recorded for the job. The homeowner should ask, then check the county records to confirm.<\/p>\n<p>A common mistake is assuming a permit means a notice exists, or that a notice means a permit was pulled. Check each one separately. They answer different questions about the same project.<\/p>\n<h2>What Must a Notice of Commencement Include?<\/h2>\n<p>It also describes the project itself. Those details tie later payment claims to the right property and the right contract.<\/p>\n<p>Small errors cause real confusion. A wrong address, a misspelled owner name, or the wrong contractor name can make it hard to tell which project the notice covers. Compare the notice line by line against the signed contract and the permit.<\/p>\n<p>Read every line before the notice is recorded. If the details don&#8217;t match the job, raise it right away. Fixing a record early is easier than sorting out a dispute about which project it covers.<\/p>\n<h2>Where Is a Notice of Commencement Recorded in Hillsborough County?<\/h2>\n<p>A notice for a Hillsborough County property goes into the county&#8217;s official records. Permit paperwork runs through a different system. The county&#8217;s online tool, HillsGovHub, handles permit applications and licenses.<\/p>\n<p>To find a notice of commencement in the county&#8217;s records, follow these steps:<\/p>\n<ol>\n<li>Open the Hillsborough County official records search online.<\/li>\n<li>Enter the property owner&#8217;s name.<\/li>\n<li>Add the parcel number if you have it, to narrow the results.<\/li>\n<li>Look for a notice filed for the property and project dates.<\/li>\n<li>Match the address and contractor name against your contract.<\/li>\n<\/ol>\n<p>If the property sits inside the City of Tampa, the permit may run through city offices. Confirm where the property is located before you search the permit side.<\/p>\n<h2>How Does a Notice Affect Lien Rights and Paying Twice?<\/h2>\n<p>A recorded notice is one of the dates that matters in a construction lien timeline. Chapter 713 sets the notices, claims, and deadlines that follow. The statute sets the time limits and procedures for each step.<\/p>\n<p>Here is the paying-twice problem in plain terms: payments an owner makes after the notice of commencement expires are considered improper payments and can result in the owner paying twice for improvements to the property. An owner pays the general contractor in full, but the contractor never pays the drywall subcontractor. That subcontractor may have a claim that reaches the property itself, even though the owner already paid. A lien filed against a property can create real risks for the owner.<\/p>\n<p>Owners can protect themselves with records. Ask for proof that subcontractors and suppliers were paid. Ask for lien releases or waivers with each payment. Pinellas County&#8217;s guidance also covers obtaining those releases and waivers from contractors, subcontractors, and suppliers.<\/p>\n<h2>What Happens on a Concrete Job?<\/h2>\n<p>On a concrete job, several parties sit in the payment chain. The owner hires a general contractor. The contractor hires a concrete subcontractor. The subcontractor buys ready-mix from a supplier. Each party expects payment for its share.<\/p>\n<p>Picture a slab for a new home in Tampa. The owner signs the prime contract. The concrete subcontractor pours the slab, and the supplier delivers the ready-mix. If the owner pays the contractor but the contractor doesn&#8217;t pay the supplier, the supplier may pursue its lien rights.<\/p>\n<p>Keep these documents for a concrete project:<\/p>\n<ul>\n<li>The recorded notice of commencement and its county record number<\/li>\n<li>The signed contract and any change orders<\/li>\n<li>Delivery tickets and invoices from the supplier<\/li>\n<li>Proof of every payment the owner made<\/li>\n<li>Lien waivers from the contractor and subcontractors with each payment<\/li>\n<\/ul>\n\n<div class=\"cta-dose-mid wp-block-group has-contrast-color has-surface-background-color has-text-color has-background has-global-padding is-layout-constrained wp-container-core-group-is-layout-32197852 wp-block-group-is-layout-constrained\" style=\"background-color:var(--wp--preset--color--surface,#f2f3f5);color:var(--wp--preset--color--contrast,#22252b);border-radius:8px;padding-top:1.5rem;padding-bottom:1.5rem;padding-left:1.5rem;padding-right:1.5rem;border-left:6px solid var(--wp--preset--color--cta,currentColor);box-shadow:0 2px 10px rgba(0,0,0,0.18)\">\n<h3 class=\"wp-block-heading has-contrast-color has-text-color\">Not sure what your next step is?<\/h3><p class=\"wp-block-paragraph\">Talk it through with our team &#8212; we can walk you through how a situation like yours is usually handled and what your options are.<\/p><div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\"><div class=\"wp-block-button chg-cta-call\"><a class=\"wp-block-button__link wp-element-button\" href=\"tel:+18134145715\">Schedule a consultation<\/a><\/div><div class=\"wp-block-button chg-cta-form\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/www.lawayala.com\/contact\/\">Schedule a consultation<\/a><\/div><\/div>\n<\/div>\n<h2>How Long Does a Notice Last, and Can It Change?<\/h2>\n<p>A notice of commencement runs for 1 year after recording unless the notice, or a new or amended notice, provides otherwise. After that year it is not effectual in law or equity against a conveyance, transfer, or mortgage of or lien on the real property described in the notice, or against creditors or subsequent purchasers for a valuable consideration, so check the expiration date on the recorded document. Projects often run longer than planned. Contracts and lenders can also change during the work.<\/p>\n<p>Those changes can affect which recorded notice matters for a project. A common mistake is relying on an old copy that no longer matches the current contract. Compare the recorded status in the county&#8217;s official records with the contract you have today.<\/p>\n<p>If you&#8217;re unsure which record is current, a construction litigation lawyer can review the paperwork with you. Lien timelines are easy to miss, so act early rather than waiting for a dispute.<\/p>\n<h2>Talk With Our Team About Your Hillsborough County Project<\/h2>\n<p>You may have found a notice on a project you own, received one from a contractor, or spotted an unpaid invoice on a Brandon or Tampa job. You don&#8217;t have to sort out the lien timeline alone.<\/p>\n<p>Ayala Law PA handles <a href=\"\/resources\/business-litigation\/\">business litigation<\/a>, including construction litigation such as contractor and subcontractor disputes and lien foreclosure. The firm serves businesses in Tampa, Hillsborough County, and the Tampa Bay area. Its only office is at 1646 W Snow Ave, Tampa. Eduardo A. Maura is the responsible lawyer for this page.<\/p>\n<p>If an unfamiliar notice has turned up on a project you own, pay for, or work on, our team can talk through the facts with you. Call (813) 414-5715 or <a href=\"https:\/\/www.lawayala.com\/contact\/\">contact our office<\/a>.<\/p>\n<details class=\"wp-block-details chg-faq is-layout-flow wp-block-details-is-layout-flow\"><summary>Is a notice of commencement the same as a building permit?<\/summary><p>No. A notice of commencement is a recorded document, while a building permit is approval from the local permitting office.<\/p><\/details><details class=\"wp-block-details chg-faq is-layout-flow wp-block-details-is-layout-flow\"><summary>How do I find a notice of commencement Hillsborough County records show?<\/summary><p>Search the Hillsborough County official records by owner name, and add the parcel number if you have it.<\/p><\/details><details class=\"wp-block-details chg-faq is-layout-flow wp-block-details-is-layout-flow\"><summary>Does a notice of commencement affect lien rights?<\/summary><p>It is one of the dates in a construction lien timeline. Chapter 713 sets the notices, claims, and deadlines that follow.<\/p><\/details>\n\n<\/article>\n<footer class=\"disclaimer\"><em>Attorney advertising. The information on this page is for general informational purposes only and is not legal advice; reading it does not create an attorney-client relationship with Ayala Law PA. Prior results do not guarantee a similar outcome. Ayala Law PA, 1646 W Snow Ave, Tampa, FL 33606.<\/em><\/footer>\n\n\n<div class=\"wp-block-group alignwide has-global-padding is-layout-constrained wp-container-core-group-is-layout-583d630a wp-block-group-is-layout-constrained\" style=\"padding-top:3rem;padding-bottom:3rem;padding-left:1.5rem;padding-right:1.5rem\">\n<h2 class=\"wp-block-heading has-text-align-center\">What this guide covers<\/h2>\n<div class=\"wp-block-columns alignwide is-layout-flex wp-container-core-columns-is-layout-f56f613f wp-block-columns-is-layout-flex\"><div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\"><p class=\"wp-block-paragraph\"><span class=\"chg-icon chg-icon--document\"><\/span><\/p><h3 class=\"wp-block-heading\">What the filing is<\/h3><p class=\"wp-block-paragraph\">A plain explanation of the notice of commencement and the details it typically records about a construction project.<\/p><\/div><div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\"><p class=\"wp-block-paragraph\"><span class=\"chg-icon chg-icon--location\"><\/span><\/p><h3 class=\"wp-block-heading\">Where to find it<\/h3><p class=\"wp-block-paragraph\">How the Hillsborough County official records are organized and how to search them by owner name or parcel number.<\/p><\/div><div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\"><p class=\"wp-block-paragraph\"><span class=\"chg-icon chg-icon--lightbulb\"><\/span><\/p><h3 class=\"wp-block-heading\">How it connects to disputes<\/h3><p class=\"wp-block-paragraph\">Why the recorded notice often becomes part of contractor, subcontractor and lien conversations.<\/p><\/div><div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\"><p class=\"wp-block-paragraph\"><span class=\"chg-icon chg-icon--info\"><\/span><\/p><h3 class=\"wp-block-heading\">What to bring to a conversation<\/h3><p class=\"wp-block-paragraph\">The project details and records that help a business discuss a construction payment problem clearly.<\/p><\/div><\/div>\n\n<\/div>\n\n\n\n<div class=\"wp-block-group has-contrast-color has-surface-background-color has-text-color has-background has-global-padding is-layout-constrained wp-container-core-group-is-layout-32197852 wp-block-group-is-layout-constrained\" style=\"background-color:var(--wp--preset--color--surface,#f2f3f5);color:var(--wp--preset--color--contrast,#22252b);border-radius:8px;padding-top:1.5rem;padding-bottom:1.5rem;padding-left:1.5rem;padding-right:1.5rem;border-left:6px solid var(--wp--preset--color--cta,currentColor);box-shadow:0 2px 10px rgba(0,0,0,0.18)\">\n<h3 class=\"wp-block-heading has-contrast-color has-text-color\">Do not confuse the recording with the permit<\/h3><p class=\"wp-block-paragraph\">A notice of commencement is a recorded document in the county&#x27;s official records. A building permit is a separate approval from the local permitting office. Checking one does not confirm the other.<\/p><div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\"><div class=\"wp-block-button chg-cta-call\"><a class=\"wp-block-button__link wp-element-button\" href=\"tel:+18134145715\">Call (813) 414-5715<\/a><\/div><div class=\"wp-block-button chg-cta-form\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/www.lawayala.com\/contact\/\">Call (813) 414-5715<\/a><\/div><\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-group alignfull has-surface-background-color has-background has-global-padding is-layout-constrained wp-container-core-group-is-layout-583d630a wp-block-group-is-layout-constrained\" style=\"padding-top:3rem;padding-bottom:3rem;padding-left:1.5rem;padding-right:1.5rem\">\n<h2 class=\"wp-block-heading has-text-align-center\">Common questions about lien filings<\/h2>\n<div class=\"wp-block-columns alignwide is-layout-flex wp-container-core-columns-is-layout-f56f613f wp-block-columns-is-layout-flex\"><div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\"><div class=\"wp-block-group has-base-background-color has-background is-layout-flow wp-block-group-is-layout-flow\" style=\"border-radius:8px;box-shadow:0 4px 14px rgba(0,0,0,0.08);padding-top:1.5rem;padding-bottom:1.5rem;padding-left:1.5rem;padding-right:1.5rem\"><h3 class=\"wp-block-heading\">Is a notice the same as a permit?<\/h3><p class=\"wp-block-paragraph\">No. One is recorded with the county and the other is issued by the permitting office. They serve different purposes.<\/p><\/div><\/div><div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\"><div class=\"wp-block-group has-base-background-color has-background is-layout-flow wp-block-group-is-layout-flow\" style=\"border-radius:8px;box-shadow:0 4px 14px rgba(0,0,0,0.08);padding-top:1.5rem;padding-bottom:1.5rem;padding-left:1.5rem;padding-right:1.5rem\"><h3 class=\"wp-block-heading\">How do I search for one?<\/h3><p class=\"wp-block-paragraph\">Search the Hillsborough County official records by owner name, and add the parcel number if you have it to narrow the results.<\/p><\/div><\/div><div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\"><div class=\"wp-block-group has-base-background-color has-background is-layout-flow wp-block-group-is-layout-flow\" style=\"border-radius:8px;box-shadow:0 4px 14px rgba(0,0,0,0.08);padding-top:1.5rem;padding-bottom:1.5rem;padding-left:1.5rem;padding-right:1.5rem\"><h3 class=\"wp-block-heading\">Why do project records matter?<\/h3><p class=\"wp-block-paragraph\">Dates, parties and property details shape how a construction payment dispute is documented and discussed.<\/p><\/div><\/div><div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\"><div class=\"wp-block-group has-base-background-color has-background is-layout-flow wp-block-group-is-layout-flow\" style=\"border-radius:8px;box-shadow:0 4px 14px rgba(0,0,0,0.08);padding-top:1.5rem;padding-bottom:1.5rem;padding-left:1.5rem;padding-right:1.5rem\"><h3 class=\"wp-block-heading\">When should I speak with a lawyer?<\/h3><p class=\"wp-block-paragraph\">If a payment, lien or contract question is already affecting your business, it helps to talk through the facts early.<\/p><\/div><\/div><\/div>\n\n<\/div>\n\n\n\n<div class=\"wp-block-group alignfull has-base-color has-primary-background-color has-text-color has-background has-global-padding is-layout-constrained wp-container-core-group-is-layout-4d466591 wp-block-group-is-layout-constrained\" style=\"background-color:var(--wp--preset--color--primary,#20242e);color:var(--wp--preset--color--base,#ffffff);padding-top:3rem;padding-bottom:3rem;padding-left:1.5rem;padding-right:1.5rem\">\n<h2 class=\"wp-block-heading has-text-align-center has-base-color has-text-color\">Talk with Eduardo A. Maura about a construction or lien matter<\/h2>\n<div class=\"wp-block-buttons is-content-justification-center is-layout-flex wp-container-core-buttons-is-layout-0aa01211 wp-block-buttons-is-layout-flex\"><div class=\"wp-block-button chg-cta chg-cta-call\"><a class=\"wp-block-button__link wp-element-button\" href=\"tel:+18134145715\">Book a Case Evaluation<\/a><\/div><div class=\"wp-block-button chg-cta chg-cta-form\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/www.lawayala.com\/contact\/\">Book a Case Evaluation<\/a><\/div><\/div>\n<\/div>\n\n<h2 class=\"wp-block-heading\">Related practice areas<\/h2><ul class=\"wp-block-list\"><li>Can You Get Money Back From Unlicensed Contractors in Tampa?<\/li><\/ul>\n<!-- chg:section-siblings -->\n<nav aria-label=\"More in this section\">\n<h2>More in this section<\/h2>\n<ul><li><a href=\"\/resources\/business-litigation\/notice-of-commencement-florida-payment-dispute\/\">What Is a Notice of Commencement in Florida, and Why It Matters in a Construction Payment Dispute?<\/a><\/li><li><a href=\"\/resources\/business-litigation\/notice-to-owner-lien-rights-florida\/\">Notice to Owner and Lien Rights Attorney for Florida Contractors<\/a><\/li><li><a href=\"\/resources\/business-litigation\/overseas-buyer-wont-pay-florida-company\/\">Overseas Buyer Won&#x27;t Pay for Goods Shipped to Florida: Collection and Litigation Options for Importers and Exporters<\/a><\/li><li><a href=\"\/resources\/business-litigation\/partnership-dissolution-lawsuit-tampa\/\">Partnership and Shareholder Dissolution Lawsuits in Tampa: When a Co-Owner Will Not Agree to Split or Sell<\/a><\/li><li><a href=\"\/resources\/business-litigation\/pay-if-paid-clause-florida-subcontractor\/\">Pay-If-Paid Clauses in Florida Subcontracts: What a Subcontractor Can and Cannot Be Forced to Accept<\/a><\/li><\/ul>\n<\/nav>\n<!-- \/chg:section-siblings -->","protected":false},"excerpt":{"rendered":"<p>Plain-language guide to Florida&#8217;s notice of commencement: what it is, how it affects lien rights, and how to search Hillsborough County records.<\/p>\n","protected":false},"author":2,"featured_media":0,"parent":1563,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"chg_review":"","chg_sendback":"","chg_canonical":"","chg_lang":"","chg_hreflang":"[]","chg_jsonld":"[{\"about\": [{\"@type\": \"Thing\", \"name\": \"Contract\", \"sameAs\": \"https:\/\/en.wikipedia.org\/wiki\/Contract\"}, {\"@type\": \"Thing\", \"name\": \"Lawsuit\", \"sameAs\": \"https:\/\/en.wikipedia.org\/wiki\/Lawsuit\"}], \"author\": {\"@type\": \"Person\", \"name\": \"Eduardo A. Maura\", \"url\": \"https:\/\/www.lawayala.com\/eduardo-a-maura\/\", \"jobTitle\": \"Attorney\", \"worksFor\": {\"@type\": \"Organization\", \"@id\": \"https:\/\/www.lawayala.com\/#organization\", \"name\": \"Ayala Law PA\", \"url\": \"https:\/\/www.lawayala.com\/\"}}, \"@context\": \"https:\/\/schema.org\", \"audience\": {\"@type\": \"Audience\", \"audienceType\": \"Property owners, general contractors, subcontractors, and material suppliers on construction projects\"}, \"headline\": \"Notice of Commencement in Hillsborough County: A Plain-Language Lien Guide\", \"isPartOf\": {\"name\": \"Florida construction lien resources\", \"@type\": \"WebSite\"}, \"keywords\": \"notice of commencement Hillsborough County, Florida notice of commencement, notice of commencement Florida lien rights, Florida Statute 713.13, where to record notice of commencement Hillsborough County, notice of commencement expiration Florida, construction lien Florida owner, notice to owner Florida subcontractor, find notice of commencement Hillsborough County records\", \"mentions\": [{\"name\": \"Tampa, Florida\", \"@type\": \"Place\"}, {\"name\": \"Brandon, Florida\", \"@type\": \"Place\"}, {\"name\": \"Riverview, Florida\", \"@type\": \"Place\"}, {\"name\": \"Plant City, Florida\", \"@type\": \"Place\"}, {\"name\": \"Temple Terrace, Florida\", \"@type\": \"Place\"}], \"publisher\": {\"@type\": \"Organization\", \"@id\": \"https:\/\/www.lawayala.com\/#organization\", \"name\": \"Ayala Law PA\", \"url\": \"https:\/\/www.lawayala.com\/\"}, \"speakable\": {\"@type\": \"SpeakableSpecification\", \"cssSelector\": [\"article > p:first-of-type\", \".wp-block-details p\", \"article > h1\"]}, \"inLanguage\": \"en-US\", \"mainEntity\": [{\"@type\": \"Question\", \"name\": \"Is a notice of commencement the same as a building permit?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"No. A notice of commencement is a recorded document, while a building permit is approval from the local permitting office.\"}}, {\"@type\": \"Question\", \"name\": \"How do I find a notice of commencement Hillsborough County records show?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"Search the Hillsborough County official records by owner name, and add the parcel number if you have it.\"}}, {\"@type\": \"Question\", \"name\": \"Does a notice of commencement affect lien rights?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"It is one of the dates in a construction lien timeline. Chapter 713 sets the notices, claims, and deadlines that follow.\"}}], \"description\": \"Plain-language guide to Florida's notice of commencement under Florida Statute 713.13: what the recorded notice is, when it applies, what it must contain, how it affects lien rights and paying-twice risk, and how to search Hillsborough County official records for a recorded copy.\", \"spatialCoverage\": {\"name\": \"Hillsborough County, Florida\", \"@type\": \"Place\"}, \"reviewedBy\": {\"@type\": \"Person\", \"name\": \"Eduardo A. Maura\", \"url\": \"https:\/\/www.lawayala.com\/eduardo-a-maura\/\", \"jobTitle\": \"Attorney\", \"worksFor\": {\"@type\": \"Organization\", \"@id\": \"https:\/\/www.lawayala.com\/#organization\", \"name\": \"Ayala Law PA\", \"url\": \"https:\/\/www.lawayala.com\/\"}}, \"@type\": [\"Article\", \"FAQPage\"], \"image\": \"https:\/\/www.lawayala.com\/resources\/wp-content\/uploads\/2026\/11\/certified-mail-envelope-marked-notice-of-breach-beside-a-pur-photo-13.jpg\"}, {\"@context\": \"https:\/\/schema.org\", \"@type\": \"BreadcrumbList\", \"itemListElement\": [{\"@type\": \"ListItem\", \"position\": 1, \"name\": \"Home\", \"item\": \"https:\/\/www.lawayala.com\/resources\/\"}, {\"@type\": \"ListItem\", \"position\": 2, \"name\": \"Business Litigation\", \"item\": \"https:\/\/www.lawayala.com\/resources\/business-litigation\/\"}, {\"@type\": \"ListItem\", \"position\": 3, \"name\": \"Notice of Commencement Hillsborough County: Lien Guide\", \"item\": \"https:\/\/www.lawayala.com\/resources\/business-litigation\/notice-of-commencement-florida-lien-rights\/\"}]}]","chg_meta_description":"Plain-language guide to Florida's notice of commencement: what it is, how it affects lien rights, and how to search Hillsborough County records.","footnotes":""},"class_list":["post-16874","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.lawayala.com\/resources\/wp-json\/wp\/v2\/pages\/16874","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.lawayala.com\/resources\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.lawayala.com\/resources\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.lawayala.com\/resources\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.lawayala.com\/resources\/wp-json\/wp\/v2\/comments?post=16874"}],"version-history":[{"count":1,"href":"https:\/\/www.lawayala.com\/resources\/wp-json\/wp\/v2\/pages\/16874\/revisions"}],"predecessor-version":[{"id":16876,"href":"https:\/\/www.lawayala.com\/resources\/wp-json\/wp\/v2\/pages\/16874\/revisions\/16876"}],"up":[{"embeddable":true,"href":"https:\/\/www.lawayala.com\/resources\/wp-json\/wp\/v2\/pages\/1563"}],"wp:attachment":[{"href":"https:\/\/www.lawayala.com\/resources\/wp-json\/wp\/v2\/media?parent=16874"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}