{"id":3591,"date":"2026-10-26T00:49:28","date_gmt":"2026-10-26T00:49:28","guid":{"rendered":"https:\/\/www.lawayala.com\/resources\/resources-construction-project-problems-florida\/resources-construction-lien-lawsuit-time-limit-florida\/"},"modified":"2026-11-04T01:24:20","modified_gmt":"2026-11-04T01:24:20","slug":"resources-construction-lien-lawsuit-time-limit-florida","status":"publish","type":"page","link":"https:\/\/www.lawayala.com\/resources\/resources-construction-project-problems-florida\/resources-construction-lien-lawsuit-time-limit-florida\/","title":{"rendered":"Tampa Construction Lien Lawsuit Deadlines in Florida"},"content":{"rendered":"\n<div class=\"wp-block-cover alignfull is-dark chg-hero\" style=\"min-height:460px;aspect-ratio:unset;\"><span aria-hidden=\"true\" class=\"wp-block-cover__background has-background-dim-60 has-background-dim wp-block-cover__gradient-background has-background-gradient\" style=\"background:linear-gradient(90deg,rgba(32,36,46,1) 0%,rgba(32,36,46,1) 55%,rgba(32,36,46,0.7) 100%)\"><\/span><img class=\"wp-block-cover__image-background wp-image-3590\" alt=\"Half-built steel-framed office tower at dusk, with construction drawings and a site schedule spread on a white pickup hood beside a job trailer.\" src=\"https:\/\/www.lawayala.com\/resources\/wp-content\/uploads\/2026\/10\/half-built-steel-framed-office-tower-at-dusk-with-constructi-photo.jpg\" width=\"1376\" height=\"768\" srcset=\"https:\/\/www.lawayala.com\/resources\/wp-content\/uploads\/2026\/10\/half-built-steel-framed-office-tower-at-dusk-with-constructi-photo-150x150.jpg 150w, https:\/\/www.lawayala.com\/resources\/wp-content\/uploads\/2026\/10\/half-built-steel-framed-office-tower-at-dusk-with-constructi-photo-300x167.jpg 300w, https:\/\/www.lawayala.com\/resources\/wp-content\/uploads\/2026\/10\/half-built-steel-framed-office-tower-at-dusk-with-constructi-photo-768x429.jpg 768w, https:\/\/www.lawayala.com\/resources\/wp-content\/uploads\/2026\/10\/half-built-steel-framed-office-tower-at-dusk-with-constructi-photo-1024x572.jpg 1024w, https:\/\/www.lawayala.com\/resources\/wp-content\/uploads\/2026\/10\/half-built-steel-framed-office-tower-at-dusk-with-constructi-photo.jpg 1376w\" sizes=\"(max-width: 825px) 825px, 100vw\" fetchpriority=\"high\" decoding=\"async\"\/><div class=\"wp-block-cover__inner-container has-global-padding is-layout-constrained wp-block-cover-is-layout-constrained\">\n<p class=\"chg-eyebrow has-base-color has-text-color wp-block-paragraph\" style=\"text-shadow:0 1px 3px rgba(0,0,0,0.6),0 0 18px rgba(0,0,0,0.35)\">Construction Litigation | Tampa, Florida<\/p><h1 class=\"wp-block-heading has-base-color has-text-color\" style=\"text-shadow:0 1px 3px rgba(0,0,0,0.6),0 0 18px rgba(0,0,0,0.35)\">Construction Lien Lawsuits in Tampa: Know the Deadlines Before They Pass<\/h1><p class=\"has-base-color has-text-color wp-block-paragraph\" style=\"font-size:clamp(0.875rem, 0.875rem + ((1vw - 0.2rem) * 0.625), 1.25rem);text-shadow:0 1px 3px rgba(0,0,0,0.6),0 0 18px rgba(0,0,0,0.35)\">Ayala Law PA helps contractors, subcontractors and property owners in Hillsborough County and the Tampa Bay area understand lien rights, lien foreclosure and the timing that can decide a construction dispute.<\/p><div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\"><div class=\"wp-block-button chg-cta chg-cta-call\"><a class=\"wp-block-button__link wp-element-button\" href=\"tel:+13055702208\">Book a Case Evaluation<\/a><\/div><div class=\"wp-block-button chg-cta chg-cta-form\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/www.lawayala.com\/contact\/\">Book a Case Evaluation<\/a><\/div><\/div>\n<\/div><\/div>\n\n\n<p class=\"wp-block-paragraph\" style=\"font-size:0.85rem;color:#6b7280;margin-bottom:1.5rem\">By Eduardo A. Maura \u00b7 Published October 25, 2026<\/p>\n\n<article lang=\"en\">\n\n<h2>How Long Do I Have to File a Construction Lien Lawsuit in Florida?<\/h2>\n<p>There is no single answer. If you&#8217;re asking how long do I have to file a construction lien lawsuit in Florida, the honest answer is that several clocks run at once. Other claims, such as a contract claim, follow separate time limits under section 95.11. Missing one date can end a lien claim, even when the unpaid debt is real.<\/p>\n\n<div class=\"cta-dose-mid wp-block-group has-contrast-color has-surface-background-color has-text-color has-background has-global-padding is-layout-constrained wp-container-core-group-is-layout-32197852 wp-block-group-is-layout-constrained\" style=\"background-color:var(--wp--preset--color--surface,#f2f3f5);color:var(--wp--preset--color--contrast,#22252b);border-radius:8px;padding-top:1.5rem;padding-bottom:1.5rem;padding-left:1.5rem;padding-right:1.5rem;border-left:6px solid var(--wp--preset--color--cta,currentColor);box-shadow:0 2px 10px rgba(0,0,0,0.18)\">\n<h3 class=\"wp-block-heading has-contrast-color has-text-color\">Not sure what your next step is?<\/h3><p class=\"wp-block-paragraph\">Talk it through with our team &#8212; we can walk you through how a situation like yours is usually handled and what your options are.<\/p><div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\"><div class=\"wp-block-button chg-cta-call\"><a class=\"wp-block-button__link wp-element-button\" href=\"tel:+13055702208\">Schedule a consultation<\/a><\/div><div class=\"wp-block-button chg-cta-form\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/www.lawayala.com\/contact\/\">Schedule a consultation<\/a><\/div><\/div>\n<\/div>\n\n<figure class=\"wp-block-image size-large has-custom-border\"><img decoding=\"async\" src=\"https:\/\/www.lawayala.com\/resources\/wp-content\/uploads\/2026\/10\/modern-office-building-with-a-striking-red-glass-facade-unde-photo.jpg\" alt=\"Modern office building with a striking red glass facade under a clear blue sky.\" style=\"border-radius:8px;width:100%;aspect-ratio:16\/9;object-fit:cover\"\/><\/figure>\n<h2>The Short Answer: Florida Lien Deadlines Are Separate Clocks<\/h2>\n<p>Florida lien deadlines are separate clocks, so one date will not cover the whole project. <a href=\"http:\/\/www.leg.state.fl.us\/statutes\/index.cfm?App_mode=Display_Statute&amp;URL=0700-0799\/0713\/0713ContentsIndex.html\">Florida construction lien law<\/a> covers notices to owner, claims of lien, lien deadlines, lien foreclosure, and fraudulent liens. Each step has its own timing.<\/p>\n<p>Each clock starts from a specific event. Under <a href=\"https:\/\/www.leg.state.fl.us\/statutes\/index.cfm?App_mode=Display_Statute&amp;URL=0000-0099\/0095\/Sections\/0095.031.html\">Fla. Stat. \u00a7 95.031<\/a>, a cause of action accrues when the last element of the claim occurs. In plain terms, the clock starts when the last required event happens, not when the job began.<\/p>\n<p>Think of the steps as a sequence. Early events set up later dates. A lien can be lost at the recording step even if the lawsuit clock has not started yet. That is why you should track every event from the first day of the job.<\/p>\n<p>The start date matters a lot. A date that looks obvious on a calendar can still be disputed later. For the wider framework, read our guide to <a href=\"\/resources\/resources-construction-project-problems-florida\/\">Florida construction project problems<\/a>.<\/p>\n<h2>Deadline to Record a Claim of Lien<\/h2>\n<p>A lienor is the person who claims the lien, usually a contractor, subcontractor, or supplier. Final furnishing means the last day that lienor did work or supplied materials for the project.<\/p>\n<p>So for a payment bond claim, the date of last work is central. Get it wrong and the rest of the timeline may not matter.<\/p>\n<p>Final furnishing is often disputed. Parties argue about whether a last site visit, a small delivery, or a punch-list trip counts as work on the project. Those arguments can decide whether the recording deadline was met.<\/p>\n<p>The recording deadline is separate from any notice deadline and from the later deadline to sue. Meeting one does not satisfy the others. Keep dated records of the last day of work, including daily logs, delivery tickets, and time sheets. Keep a copy of any recorded lien packet and records showing how each document was delivered.<\/p>\n<h2>Notice to Owner and Notice of Commencement Deadlines<\/h2>\n<p>The notice tells the property owner that someone is working or supplying materials on the job.<\/p>\n<p>Owners and lienors both need to know where it stands.<\/p>\n<p>For that reason, notice dates belong on the same calendar as the recording date. For a step-by-step look at the notice process, read our guide to notice to owner in Florida.<\/p>\n<h2>Deadline to File the Lien Enforcement Lawsuit<\/h2>\n<p>Chapter 713 sets its own deadline to file suit to enforce a lien.<\/p>\n<p><a href=\"https:\/\/www.leg.state.fl.us\/statutes\/index.cfm?App_mode=Display_Statute&amp;URL=0000-0099\/0095\/Sections\/0095.11.html\">Section 95.11<\/a> of the Florida Statutes also sets a one-year period for some lien-related actions, including <a href=\"https:\/\/www.leg.state.fl.us\/statutes\/index.cfm?App_mode=Display_Statute&amp;URL=0000-0099\/0095\/Sections\/0095.11.html\">enforcement of an equitable lien<\/a> arising from the furnishing of labor, services, or material for the improvement of real property. Among the actions that <a href=\"https:\/\/www.leg.state.fl.us\/statutes\/index.cfm?App_mode=Display_Statute&amp;URL=0000-0099\/0095\/Sections\/0095.11.html\">Fla. Stat. \u00a7 95.11<\/a> says must be commenced within one year are an action to enforce an equitable lien arising from the furnishing of labor, services, or material for the improvement of real property, and, except for actions governed by s. 255.05(10), s. 337.18(1), or s. 713.23(1)(e), an action to enforce any claim against a payment bond on which the principal is a contractor, subcontractor, or sub-subcontractor as defined in s. 713.01, for private work as well as public work, running from the last furnishing of labor, services, or materials. Under Florida law, an action to enforce a claim against a payment bond on which the principal is a contractor, subcontractor, or sub-subcontractor, for private work as well as public work, is subject to a limitations period that runs from the last furnishing of labor, services, or materials, or from the contractor&#8217;s last furnishing if the contractor is the principal on a bond on the same project, whichever is later. That period runs from the last furnishing of labor, services, or materials, or from the contractor&#8217;s last furnishing if the contractor is the principal on a bond on the same construction project, whichever is later. Actions governed by s. 255.05(10), s. 337.18(1), or s. 713.23(1)(e) are excepted.<\/p>\n<p>Under <a href=\"https:\/\/www.leg.state.fl.us\/statutes\/index.cfm?App_mode=Display_Statute&amp;URL=0000-0099\/0095\/Sections\/0095.11.html\">Fla. Stat. \u00a7 95.11<\/a>, where the contractor is the principal on a bond on the same construction project, the payment bond period runs from the last furnishing of labor, services, or materials or from the last furnishing of labor, services, or materials by the contractor, whichever is later. The statute also carves out certain actions that other provisions govern, so the exceptions matter.<\/p>\n<p>Here is a simple example. Say a subcontractor&#8217;s last delivery was on March 1. Under the payment bond rule in section 95.11, unless the claim is one governed by s. 255.05(10), s. 337.18(1), or s. 713.23(1)(e), the one-year period would start from that March 1 date. If the contractor was the bond principal and its own last work came later, the later date would control. A suit filed after the period ends can fail, even if the debt is real.<\/p>\n<h2>How an Owner&#8217;s Notice of Contest Changes the Clock<\/h2>\n<p>Owners often use it to force the question of lien validity. That is why it is often the first sign of a dispute.<\/p>\n<p>Calendar the date the day you receive one. Don&#8217;t assume you still have the full timeline you had before.<\/p>\n<p>A notice of contest can also reveal problems you did not expect, such as missing notices or unclear final work dates. Pull your records together right away so you can see the whole picture. Waiting until the last week is the mistake that causes the most trouble.<\/p>\n\n<div class=\"cta-dose-mid wp-block-group has-contrast-color has-surface-background-color has-text-color has-background has-global-padding is-layout-constrained wp-container-core-group-is-layout-32197852 wp-block-group-is-layout-constrained\" style=\"background-color:var(--wp--preset--color--surface,#f2f3f5);color:var(--wp--preset--color--contrast,#22252b);border-radius:8px;padding-top:1.5rem;padding-bottom:1.5rem;padding-left:1.5rem;padding-right:1.5rem;border-left:6px solid var(--wp--preset--color--cta,currentColor);box-shadow:0 2px 10px rgba(0,0,0,0.18)\">\n<h3 class=\"wp-block-heading has-contrast-color has-text-color\">Not sure what your next step is?<\/h3><p class=\"wp-block-paragraph\">Talk it through with our team &#8212; we can walk you through how a situation like yours is usually handled and what your options are.<\/p><div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\"><div class=\"wp-block-button chg-cta-call\"><a class=\"wp-block-button__link wp-element-button\" href=\"tel:+13055702208\">Schedule a consultation<\/a><\/div><div class=\"wp-block-button chg-cta-form\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/www.lawayala.com\/contact\/\">Schedule a consultation<\/a><\/div><\/div>\n<\/div>\n<h2>Separate Contract Claims and Section 95.11 Time Limits<\/h2>\n<p>Separately, <a href=\"https:\/\/www.leg.state.fl.us\/statutes\/index.cfm?App_mode=Display_Statute&amp;URL=0000-0099\/0095\/Sections\/0095.11.html\">Fla. Stat. \u00a7 95.11<\/a> sets a four-year period for suits over the design or construction of improvements to real property, with the time running from the date the authority having jurisdiction issues a temporary certificate of occupancy, a certificate of occupancy, or a certificate of completion, or the date of abandonment of construction if not completed, whichever date is earliest; except that, when the action involves a latent defect, the time runs from the time the defect is discovered or should have been discovered with the exercise of due diligence. In any event, the action must be commenced within 7 years after the date the authority having jurisdiction issues a temporary certificate of occupancy, a certificate of occupancy, or a certificate of completion, or the date of abandonment of construction if not completed, whichever date is earliest.<\/p>\n<p>Section 95.11 sets different periods for different types of claims. So the right deadline turns on the kind of claim you are bringing and when it accrued. Review the claims together, because one may outlast the other.<\/p>\n<p>Florida courts also keep contract disputes apart from tort claims. In <a href=\"https:\/\/flcourts-media.flcourts.gov\/content\/download\/2448351\/opinion\/Opinion_2023-0673.pdf\">Frutafino, S.A.S. v. Dole Chile, S.A.<\/a>, a Third District decision, the court explained that a party generally cannot recover in tort for a contract dispute. The tort must be independent of the breach. The court&#8217;s opinion in <a href=\"https:\/\/flcourts-media.flcourts.gov\/content\/download\/2448351\/opinion\/Opinion_2023-0673.pdf\">Frutafino, S.A.S. v. Dole Chile, S.A.<\/a> refers to the common law principle that a plaintiff may not recover in tort for a contract dispute unless the tort is independent of any breach of contract.<\/p>\n<p>Fraud claims follow their own timing. Under <a href=\"https:\/\/www.leg.state.fl.us\/statutes\/index.cfm?App_mode=Display_Statute&amp;URL=0000-0099\/0095\/Sections\/0095.031.html\">Fla. Stat. \u00a7 95.031<\/a>, the time to bring a fraud claim runs from when the facts giving rise to the claim were discovered or should have been discovered with the exercise of due diligence, not from when the last element of the claim occurred. It must still be begun within 12 years after the fraud was committed.<\/p>\n<p>Some events pause the clock. Under <a href=\"https:\/\/www.leg.state.fl.us\/statutes\/index.cfm?App_mode=Display_Statute&amp;URL=0000-0099\/0095\/Sections\/0095.051.html\">Fla. Stat. \u00a7 95.051<\/a>, an arbitration about the dispute pauses the limitations period while it is pending. A payment of part of the principal or interest on a written obligation also pauses it.<\/p>\n<p>Florida also voids a contract term that sets a shorter time to sue than the statute allows. Under <a href=\"https:\/\/www.leg.state.fl.us\/statutes\/index.cfm?App_mode=Display_Statute&amp;URL=0000-0099\/0095\/Sections\/0095.03.html\">Fla. Stat. \u00a7 95.03<\/a>, a contract provision that sets a shorter period than the applicable statute of limitations for beginning an action arising out of the contract is void. For unpaid-contractor situations, see our guide to general contractor not paying subcontractor.<\/p>\n<h2>How Long a Recorded Lien Stays on the Property and How It Ends<\/h2>\n<p>A recorded lien does not stay in place forever. It can end through a voluntary release, a court order, or a bond that replaces it.<\/p>\n<p>While a lien is open, it can affect refinancing or a sale of the property. Owners often want a lien cleared quickly for that reason. A title problem can slow a closing that is already on the calendar.<\/p>\n<p>Some owners replace a lien with a bond, which can clear the title while the dispute continues. Our guide on bonding off a construction lien explains the general process.<\/p>\n<p>Review title and any bonding decision early. Waiting can leave less time to act when a sale or loan closing is close. Early review also helps you see which route fits the facts of your project.<\/p>\n<h2>Frequently Asked Questions About Florida Construction Lien Timing<\/h2><details class=\"wp-block-details chg-faq is-layout-flow wp-block-details-is-layout-flow\"><summary>How long does a lien stay on my property in Florida?<\/summary><p>Whether a suit was filed in time also matters.<\/p><\/details><details class=\"wp-block-details chg-faq is-layout-flow wp-block-details-is-layout-flow\"><summary>How fast can a lien be removed?<\/summary><p>A lien can be removed through a voluntary release, a court order, or a bond that replaces it.<\/p><\/details><details class=\"wp-block-details chg-faq is-layout-flow wp-block-details-is-layout-flow\"><summary>Is there a statute of limitations on a mechanic&#8217;s lien?<\/summary><p>Chapter 713 sets lien deadlines, and section 95.11 sets separate periods for some related claims. The seven-year figure people search for comes from the defect-claim rule in section 95.11, not from a lien deadline.<\/p><\/details><details class=\"wp-block-details chg-faq is-layout-flow wp-block-details-is-layout-flow\"><summary>Can a subcontractor sue the owner if the general contractor was paid?<\/summary><p>It can, depending on the notices served and the payment history. Those facts should be reviewed together.<\/p><\/details>\n<figure class=\"wp-block-image size-large has-custom-border\"><img decoding=\"async\" src=\"https:\/\/www.lawayala.com\/resources\/wp-content\/uploads\/2026\/10\/construction-site-with-cranes-and-steel-framework-silhouette-photo.jpg\" alt=\"Construction site with cranes and steel building framework silhouetted against a sunset sky.\" style=\"border-radius:8px;width:100%;aspect-ratio:16\/9;object-fit:cover\"\/><\/figure>\n<h2>Tracking Your Deadlines and Taking the Next Step<\/h2>\n<p>Track five dates from the first day of the project. They are final furnishing, notice dates, the last day to record the claim of lien, the enforcement suit date, and any notice of contest date. Add the section 95.11 date for any claim founded on the design, planning, or construction of an improvement to real property. <a href=\"https:\/\/www.leg.state.fl.us\/statutes\/index.cfm?App_mode=Display_Statute&amp;URL=0000-0099\/0095\/Sections\/0095.11.html\">Fla. Stat. \u00a7 95.11<\/a> reads: &#8220;(b) An action founded on the design, planning, or construction of an improvement to real property, with the time running from the date the authority having jurisdiction issues a temporary certificate of occupancy, a certificate of occupancy, or a certificate of completion, or the date of abandonment of construction if not completed, whichever date is earliest; except that, when the action involves a latent defect, the time runs from the time the defect is discovered or should have been discovered with the exercise of due diligence.&#8221;<\/p>\n<p>If you are an unpaid subcontractor with a recording or suit date closing in, or an owner who just received a notice of contest, the calendar is urgent. Each date can change what remains available to you.<\/p>\n<p>Ayala Law PA focuses on business litigation, including construction litigation. That work covers contractor and subcontractor disputes, lien foreclosure, and construction contract fraud in Florida courts and arbitration. The firm&#8217;s office is at 1646 W Snow Ave in Tampa, Florida, and it represents businesses in Hillsborough County and the Tampa Bay area in Florida courts and arbitration. Eduardo A. Maura is the responsible lawyer for this page.<\/p>\n<p>If you have a deadline on your calendar and want to talk it through, call (305) 570-2208 or send a message through our <a href=\"https:\/\/www.lawayala.com\/contact\/\">contact page<\/a>. Fee arrangements are explained when you reach out.<\/p>\n\n<\/article>\n<footer class=\"disclaimer\"><em>Attorney advertising. The information on this page is for general informational purposes only and is not legal advice; reading it does not create an attorney-client relationship with Ayala Law PA. Prior results do not guarantee a similar outcome. Ayala Law PA, 1646 W Snow Ave, Tampa, FL 33606.<\/em><\/footer>\n\n\n<div class=\"wp-block-group alignwide has-global-padding is-layout-constrained wp-container-core-group-is-layout-583d630a wp-block-group-is-layout-constrained\" style=\"padding-top:3rem;padding-bottom:3rem;padding-left:1.5rem;padding-right:1.5rem\">\n<h2 class=\"wp-block-heading has-text-align-center\">How Ayala Law PA Approaches Construction Lien Disputes<\/h2>\n<div class=\"wp-block-columns alignwide is-layout-flex wp-container-core-columns-is-layout-f56f613f wp-block-columns-is-layout-flex\"><div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\"><p class=\"wp-block-paragraph\"><span class=\"chg-icon chg-icon--document\"><\/span><\/p><h3 class=\"wp-block-heading\">Lien Review<\/h3><p class=\"wp-block-paragraph\">We review the lien, the underlying contract and the project records to see what was filed, when, and what steps remain.<\/p><\/div><div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\"><p class=\"wp-block-paragraph\"><span class=\"chg-icon chg-icon--shield\"><\/span><\/p><h3 class=\"wp-block-heading\">Lien Foreclosure Litigation<\/h3><p class=\"wp-block-paragraph\">The firm focuses on lien foreclosure suits and defense in Florida courts, including disputes between contractors, subcontractors and owners.<\/p><\/div><div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\"><p class=\"wp-block-paragraph\"><span class=\"chg-icon chg-icon--users\"><\/span><\/p><h3 class=\"wp-block-heading\">Contractor and Subcontractor Disputes<\/h3><p class=\"wp-block-paragraph\">We handle payment disputes, construction contract fraud and related claims for businesses on both sides of a project.<\/p><\/div><div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\"><p class=\"wp-block-paragraph\"><span class=\"chg-icon chg-icon--location\"><\/span><\/p><h3 class=\"wp-block-heading\">Tampa Bay Focus<\/h3><p class=\"wp-block-paragraph\">The practice serves businesses in Tampa, Brandon, Riverview, Plant City, Temple Terrace and throughout Hillsborough County.<\/p><\/div><\/div>\n\n<\/div>\n\n\n\n<div class=\"wp-block-group has-contrast-color has-surface-background-color has-text-color has-background has-global-padding is-layout-constrained wp-container-core-group-is-layout-32197852 wp-block-group-is-layout-constrained\" style=\"background-color:var(--wp--preset--color--surface,#f2f3f5);color:var(--wp--preset--color--contrast,#22252b);border-radius:8px;padding-top:1.5rem;padding-bottom:1.5rem;padding-left:1.5rem;padding-right:1.5rem;border-left:6px solid var(--wp--preset--color--cta,currentColor);box-shadow:0 2px 10px rgba(0,0,0,0.18)\">\n<h3 class=\"wp-block-heading has-contrast-color has-text-color\">Time Matters in Lien Disputes<\/h3><p class=\"wp-block-paragraph\">Construction lien rights and lawsuit timing can change quickly. Contact us early so we can review your situation while your options are still open.<\/p><div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\"><div class=\"wp-block-button chg-cta-call\"><a class=\"wp-block-button__link wp-element-button\" href=\"tel:+13055702208\">Call (305) 570-2208<\/a><\/div><div class=\"wp-block-button chg-cta-form\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/www.lawayala.com\/contact\/\">Call (305) 570-2208<\/a><\/div><\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-group alignfull has-surface-background-color has-background has-global-padding is-layout-constrained wp-container-core-group-is-layout-583d630a wp-block-group-is-layout-constrained\" style=\"padding-top:3rem;padding-bottom:3rem;padding-left:1.5rem;padding-right:1.5rem\">\n<h2 class=\"wp-block-heading has-text-align-center\">Key Issues in Construction Lien Cases<\/h2>\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-f56f613f wp-block-columns-is-layout-flex\"><div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\"><div class=\"wp-block-group has-base-background-color has-background is-layout-flow wp-block-group-is-layout-flow\" style=\"border-radius:8px;box-shadow:0 4px 14px rgba(0,0,0,0.08);padding-top:1.5rem;padding-bottom:1.5rem;padding-left:1.5rem;padding-right:1.5rem\"><h3 class=\"wp-block-heading\">Filing a Lien Lawsuit<\/h3><p class=\"wp-block-paragraph\">Knowing when a foreclosure suit must be filed helps property owners, contractors and suppliers avoid losing a claim.<\/p><\/div><\/div><div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\"><div class=\"wp-block-group has-base-background-color has-background is-layout-flow wp-block-group-is-layout-flow\" style=\"border-radius:8px;box-shadow:0 4px 14px rgba(0,0,0,0.08);padding-top:1.5rem;padding-bottom:1.5rem;padding-left:1.5rem;padding-right:1.5rem\"><h3 class=\"wp-block-heading\">Responding to a Lien<\/h3><p class=\"wp-block-paragraph\">Owners and general contractors facing a lien need a clear plan for challenging, bonding or releasing it.<\/p><\/div><\/div><div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\"><div class=\"wp-block-group has-base-background-color has-background is-layout-flow wp-block-group-is-layout-flow\" style=\"border-radius:8px;box-shadow:0 4px 14px rgba(0,0,0,0.08);padding-top:1.5rem;padding-bottom:1.5rem;padding-left:1.5rem;padding-right:1.5rem\"><h3 class=\"wp-block-heading\">Related Contract Claims<\/h3><p class=\"wp-block-paragraph\">Lien disputes often overlap with breach of contract, payment and construction fraud claims that we review together.<\/p><\/div><\/div><\/div>\n\n<\/div>\n\n\n\n<div class=\"wp-block-group alignfull has-base-color has-primary-background-color has-text-color has-background has-global-padding is-layout-constrained wp-container-core-group-is-layout-4d466591 wp-block-group-is-layout-constrained\" style=\"background-color:var(--wp--preset--color--primary,#20242e);color:var(--wp--preset--color--base,#ffffff);padding-top:3rem;padding-bottom:3rem;padding-left:1.5rem;padding-right:1.5rem\">\n<h2 class=\"wp-block-heading has-text-align-center has-base-color has-text-color\">Discuss Your Construction Lien Deadline With Eduardo A. Maura<\/h2>\n<div class=\"wp-block-buttons is-content-justification-center is-layout-flex wp-container-core-buttons-is-layout-0aa01211 wp-block-buttons-is-layout-flex\"><div class=\"wp-block-button chg-cta chg-cta-call\"><a class=\"wp-block-button__link wp-element-button\" href=\"tel:+13055702208\">Book a Case Evaluation or Call (305) 570-2208<\/a><\/div><div class=\"wp-block-button chg-cta chg-cta-form\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/www.lawayala.com\/contact\/\">Book a Case Evaluation or Call (305) 570-2208<\/a><\/div><\/div>\n<\/div>\n\n<!-- chg:section-siblings -->\n<nav aria-label=\"More in this section\">\n<h2>More in this section<\/h2>\n<ul><li><a href=\"\/resources\/resources-construction-project-problems-florida\/resources-owner-withheld-payment-contractor-claim-florida\/\">Can a Contractor Recover From Me for Work I Withheld Payment On? Florida Owner Guide<\/a><\/li><li><a href=\"\/resources\/resources-construction-project-problems-florida\/construction-litigation-contractor-dispute-tampa\/\">Contractor Dispute Lawyer Tampa<\/a><\/li><li><a href=\"\/resources\/resources-construction-project-problems-florida\/construction-litigation-lien-foreclosure-florida\/\">Lien Foreclosure Attorney Florida<\/a><\/li><li><a href=\"\/resources\/resources-construction-project-problems-florida\/how-much-does-a-lawyer-charge-to-file-a-lien\/\">How much does a lawyer charge to file a lien?<\/a><\/li><\/ul>\n<\/nav>\n<!-- \/chg:section-siblings -->","protected":false},"excerpt":{"rendered":"<p>How long do you have to file a construction lien lawsuit in Florida? Learn the separate clocks for recording, notices, suits, and contract claims.<\/p>\n","protected":false},"author":2,"featured_media":0,"parent":1502,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"chg_review":"","chg_sendback":"","chg_canonical":"","chg_lang":"","chg_hreflang":"[{\"hreflang\": \"en\", \"href\": \"https:\/\/www.lawayala.com\/resources\/resources-construction-project-problems-florida\/resources-construction-lien-lawsuit-time-limit-florida\/\"}, {\"hreflang\": \"es\", \"href\": \"https:\/\/www.lawayala.com\/resources\/es\/recursos-problemas-construccion-florida\/recursos-plazo-demanda-gravamen-construccion-florida\/\"}, {\"hreflang\": \"x-default\", \"href\": \"https:\/\/www.lawayala.com\/resources\/resources-construction-project-problems-florida\/resources-construction-lien-lawsuit-time-limit-florida\/\"}]","chg_jsonld":"[{\"@context\": \"https:\/\/schema.org\", \"speakable\": {\"@type\": \"SpeakableSpecification\", \"cssSelector\": [\"article > p:first-of-type\", \".wp-block-details p\", \"article > h1\"]}, \"author\": {\"@type\": \"Person\", \"name\": \"Eduardo A. Maura\", \"url\": \"https:\/\/www.lawayala.com\/eduardo-a-maura\/\", \"jobTitle\": \"Attorney\"}, \"publisher\": {\"@type\": \"Organization\", \"@id\": \"https:\/\/www.lawayala.com\/resources\/#organization\", \"name\": \"Ayala Law PA\", \"url\": \"https:\/\/www.lawayala.com\/\"}, \"reviewedBy\": {\"@type\": \"Person\", \"name\": \"Eduardo A. Maura\", \"url\": \"https:\/\/www.lawayala.com\/eduardo-a-maura\/\", \"jobTitle\": \"Attorney\"}, \"inLanguage\": \"en\", \"mainEntity\": [{\"@type\": \"Question\", \"name\": \"How long does a lien stay on my property in Florida?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"Whether a suit was filed in time also matters.\"}}, {\"@type\": \"Question\", \"name\": \"How fast can a lien be removed?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"A lien can be removed through a voluntary release, a court order, or a bond that replaces it.\"}}, {\"@type\": \"Question\", \"name\": \"Is there a statute of limitations on a mechanic\u2019s lien?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"Chapter 713 sets lien deadlines, and section 95.11 sets separate periods for some related claims. The seven-year figure people search for comes from the defect-claim rule in section 95.11, not from a lien deadline.\"}}, {\"@type\": \"Question\", \"name\": \"Can a subcontractor sue the owner if the general contractor was paid?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"It can, depending on the notices served and the payment history. Those facts should be reviewed together.\"}}], \"@id\": \"https:\/\/www.lawayala.com\/resources\/florida-construction-lien-lawsuit-deadlines\/#article\", \"about\": [{\"name\": \"Florida construction lien deadlines\", \"@type\": \"Thing\"}, {\"name\": \"Chapter 713, Florida Statutes\", \"@type\": \"Thing\"}, {\"name\": \"Section 95.11, Florida Statutes limitation periods\", \"@type\": \"Thing\"}], \"headline\": \"Construction Lien Lawsuits in Tampa: Know the Deadlines Before They Pass\", \"mentions\": [\"claim of lien\", \"notice to owner\", \"notice of commencement\", \"notice of contest of lien\", \"lien enforcement suit\", \"bond to transfer a lien\"], \"areaServed\": {\"name\": \"Hillsborough County, Florida\", \"@type\": \"AdministrativeArea\"}, \"description\": \"Explains the separate Florida deadlines for recording a construction claim of lien, serving notices, filing a lien enforcement suit, and bringing contract claims under section 95.11, with a note on notices of contest and bonding.\", \"articleSection\": \"Construction litigation\", \"mainEntityOfPage\": \"https:\/\/www.lawayala.com\/resources\/florida-construction-lien-lawsuit-deadlines\/\", \"@type\": [\"Article\", \"FAQPage\"], \"image\": \"https:\/\/www.lawayala.com\/resources\/wp-content\/uploads\/2026\/10\/half-built-steel-framed-office-tower-at-dusk-with-constructi-photo.jpg\"}, {\"@context\": \"https:\/\/schema.org\", \"@type\": \"BreadcrumbList\", \"itemListElement\": [{\"@type\": \"ListItem\", \"position\": 1, \"name\": \"Home\", \"item\": \"https:\/\/www.lawayala.com\/resources\/\"}, {\"@type\": \"ListItem\", \"position\": 2, \"name\": \"Resources Construction Project Problems Florida\", \"item\": \"https:\/\/www.lawayala.com\/resources\/resources-construction-project-problems-florida\/\"}, {\"@type\": \"ListItem\", \"position\": 3, \"name\": \"Tampa Construction Lien Lawsuit Deadlines in Florida\", \"item\": \"https:\/\/www.lawayala.com\/resources\/resources-construction-project-problems-florida\/resources-construction-lien-lawsuit-time-limit-florida\/\"}]}]","chg_meta_description":"How long do you have to file a construction lien lawsuit in Florida? Learn the separate clocks for recording, notices, suits, and contract claims.","footnotes":""},"class_list":["post-3591","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.lawayala.com\/resources\/wp-json\/wp\/v2\/pages\/3591","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.lawayala.com\/resources\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.lawayala.com\/resources\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.lawayala.com\/resources\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.lawayala.com\/resources\/wp-json\/wp\/v2\/comments?post=3591"}],"version-history":[{"count":2,"href":"https:\/\/www.lawayala.com\/resources\/wp-json\/wp\/v2\/pages\/3591\/revisions"}],"predecessor-version":[{"id":4744,"href":"https:\/\/www.lawayala.com\/resources\/wp-json\/wp\/v2\/pages\/3591\/revisions\/4744"}],"up":[{"embeddable":true,"href":"https:\/\/www.lawayala.com\/resources\/wp-json\/wp\/v2\/pages\/1502"}],"wp:attachment":[{"href":"https:\/\/www.lawayala.com\/resources\/wp-json\/wp\/v2\/media?parent=3591"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}