{"id":7736,"date":"2026-11-03T07:43:03","date_gmt":"2026-11-03T07:43:03","guid":{"rendered":"https:\/\/www.lawayala.com\/resources\/resources-construction-disputes-florida-business-owners-guide\/resources-statute-of-limitations-repose-construction-florida\/"},"modified":"2026-11-04T01:32:50","modified_gmt":"2026-11-04T01:32:50","slug":"resources-statute-of-limitations-repose-construction-florida","status":"publish","type":"page","link":"https:\/\/www.lawayala.com\/resources\/resources-construction-disputes-florida-business-owners-guide\/resources-statute-of-limitations-repose-construction-florida\/","title":{"rendered":"Statute of Limitations for Construction Claims in Florida"},"content":{"rendered":"\n<div class=\"wp-block-cover alignfull is-dark chg-hero\" style=\"min-height:460px;aspect-ratio:unset;\"><span aria-hidden=\"true\" class=\"wp-block-cover__background has-background-dim-70 has-background-dim wp-block-cover__gradient-background has-background-gradient\" style=\"background:linear-gradient(90deg,rgba(32,36,46,1) 0%,rgba(32,36,46,1) 55%,rgba(32,36,46,0.7) 100%)\"><\/span><img class=\"wp-block-cover__image-background wp-image-7735\" alt=\"Half-built commercial office tower with exposed steel frame at dusk, with marked-up construction drawings and a site schedule on a white pickup truck\" src=\"https:\/\/www.lawayala.com\/resources\/wp-content\/uploads\/2026\/11\/half-built-commercial-office-tower-with-exposed-steel-frame-photo-2.jpg\" width=\"1376\" height=\"768\" srcset=\"https:\/\/www.lawayala.com\/resources\/wp-content\/uploads\/2026\/11\/half-built-commercial-office-tower-with-exposed-steel-frame-photo-2-150x150.jpg 150w, https:\/\/www.lawayala.com\/resources\/wp-content\/uploads\/2026\/11\/half-built-commercial-office-tower-with-exposed-steel-frame-photo-2-300x167.jpg 300w, https:\/\/www.lawayala.com\/resources\/wp-content\/uploads\/2026\/11\/half-built-commercial-office-tower-with-exposed-steel-frame-photo-2-768x429.jpg 768w, https:\/\/www.lawayala.com\/resources\/wp-content\/uploads\/2026\/11\/half-built-commercial-office-tower-with-exposed-steel-frame-photo-2-1024x572.jpg 1024w, https:\/\/www.lawayala.com\/resources\/wp-content\/uploads\/2026\/11\/half-built-commercial-office-tower-with-exposed-steel-frame-photo-2.jpg 1376w\" sizes=\"(max-width: 825px) 825px, 100vw\" fetchpriority=\"high\" decoding=\"async\"\/><div class=\"wp-block-cover__inner-container has-global-padding is-layout-constrained wp-block-cover-is-layout-constrained\">\n<p class=\"chg-eyebrow has-base-color has-text-color wp-block-paragraph\" style=\"text-shadow:0 1px 3px rgba(0,0,0,0.6),0 0 18px rgba(0,0,0,0.35)\">Construction Litigation | Tampa Bay and Hillsborough County<\/p><h1 class=\"wp-block-heading has-base-color has-text-color\" style=\"text-shadow:0 1px 3px rgba(0,0,0,0.6),0 0 18px rgba(0,0,0,0.35)\">Construction Claims and the Clock: What Florida Businesses Need to Know<\/h1><div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\"><div class=\"wp-block-button chg-cta chg-cta-call\"><a class=\"wp-block-button__link wp-element-button\" href=\"tel:+13055702208\">Call (305) 570-2208<\/a><\/div><div class=\"wp-block-button chg-cta chg-cta-form\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/www.lawayala.com\/contact\/\">Call (305) 570-2208<\/a><\/div><\/div>\n<\/div><\/div>\n\n\n<p class=\"wp-block-paragraph\" style=\"font-size:0.85rem;color:#6b7280;margin-bottom:1.5rem\">By Eduardo A. Maura \u00b7 Published November 3, 2026<\/p>\n\n<article lang=\"en\">\n\n\n<p>Many construction defect claims in Florida must be filed within four years. The clock does not always start on the day you spot a problem, though. It starts on a trigger date tied to the building project, and an outer deadline can end a claim before a defect is found. This guide covers how deadlines can affect construction claims in Florida and what records to gather now. Eduardo A. Maura is the responsible lawyer for this page. Ayala Law PA focuses on business litigation, contract disputes, and construction litigation in Florida courts and arbitration.<\/p>\n<h2>How Long Do You Have to Sue a Contractor in Florida?<\/h2>\n<p>For many construction claims, you have four years to file suit under <a href=\"https:\/\/www.leg.state.fl.us\/statutes\/index.cfm?App_mode=Display_Statute&amp;URL=0000-0099\/0095\/Sections\/0095.11.html\">\u00a7 95.11<\/a>. That period covers actions founded on the design, planning, or construction of an improvement to real property. The clock starts on a trigger date, such as the date a certificate of occupancy issues. <a href=\"https:\/\/www.leg.state.fl.us\/statutes\/index.cfm?App_mode=Display_Statute&amp;URL=0000-0099\/0095\/Sections\/0095.11.html\">Fla. Stat. \u00a7 95.11<\/a> reads: &#8220;(b) An action founded on the design, planning, or construction of an improvement to real property, with the time running from the date the authority having jurisdiction issues a temporary certificate of occupancy, a certificate of occupancy, or a certificate of completion, or the date of abandonment of construction if not completed, whichever date is earliest; except that, when the action involves a latent defect, the time runs from the time the defect is discovered or should have been discovered with the exercise of due diligence.&#8221; It does not start on the day you first see a problem. An outer limit of seven years applies to these claims. A latent defect, meaning a hidden flaw you could not see, runs from discovery. Which rule fits depends on the facts of your project, so confirm the dates early. The sections below cover each trigger, the outer limit, contract and negligence clocks, and pauses.<\/p>\n\n<div class=\"cta-dose-mid wp-block-group has-contrast-color has-surface-background-color has-text-color has-background has-global-padding is-layout-constrained wp-container-core-group-is-layout-32197852 wp-block-group-is-layout-constrained\" style=\"background-color:var(--wp--preset--color--surface,#f2f3f5);color:var(--wp--preset--color--contrast,#22252b);border-radius:8px;padding-top:1.5rem;padding-bottom:1.5rem;padding-left:1.5rem;padding-right:1.5rem;border-left:6px solid var(--wp--preset--color--cta,currentColor);box-shadow:0 2px 10px rgba(0,0,0,0.18)\">\n<p class=\"wp-block-paragraph\">If a defect, unpaid work, or breach has surfaced on your Florida project, our team can review the filing dates with you before time runs out. Talk it through with our team &#8212; we can walk you through how a situation like yours is usually handled and what your options are.<\/p><div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\"><div class=\"wp-block-button chg-cta-call\"><a class=\"wp-block-button__link wp-element-button\" href=\"tel:+13055702208\">Schedule a consultation<\/a><\/div><div class=\"wp-block-button chg-cta-form\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/www.lawayala.com\/contact\/\">Schedule a consultation<\/a><\/div><\/div>\n<\/div>\n\n<figure class=\"wp-block-image size-large has-custom-border\"><img decoding=\"async\" src=\"https:\/\/www.lawayala.com\/resources\/wp-content\/uploads\/2026\/10\/construction-site-with-cranes-and-steel-framework-silhouette-photo.jpg\" alt=\"Construction site at sunset with cranes towering over a steel building framework.\" style=\"border-radius:8px;width:100%;aspect-ratio:16\/9;object-fit:cover\"\/><\/figure>\n<h2>Statute of Limitations vs. Statute of Repose<\/h2>\n<p>A statute of limitations sets the window to file suit. A statute of repose sets an outer deadline that does not move. Florida&#8217;s construction rule uses both ideas in one sentence. Under <a href=\"https:\/\/www.leg.state.fl.us\/statutes\/index.cfm?App_mode=Display_Statute&amp;URL=0000-0099\/0095\/Sections\/0095.11.html\">\u00a7 95.11<\/a>, suit must start within four years of the trigger. In any event, it must start within seven years after the trigger date.<\/p>\n<p>This difference matters. A claim can fit inside the four-year window and still be barred. Consider a home that receives a certificate of occupancy in March 2018. A hidden leak is found in 2024. Discovery alone would allow filing into 2028. But the seven-year outer limit ended in March 2025. Under the statute&#8217;s wording, that outer limit still controls. The statute then provides that, in any event, the action must be commenced within 7 years after the date the authority having jurisdiction issues a temporary certificate of occupancy, a certificate of occupancy, or a certificate of completion, or the date of abandonment of construction if not completed, whichever date is earliest.<\/p>\n<h2>When the Four-Year Clock Starts: Accrual Triggers<\/h2>\n<p>The four-year period starts on the earliest of these dates:<\/p>\n<ul>\n<li>A temporary certificate of occupancy<\/li>\n<li>A certificate of occupancy<\/li>\n<li>A certificate of completion<\/li>\n<li>The date construction was abandoned, if the work was never finished<\/li>\n<\/ul>\n<p>The earliest event controls. A later final inspection does not reset the clock. Repairs to completed work do not extend the period either. That holds for work done under a duly issued building permit and certificate, even under warranty. For a latent defect, time runs from when the defect was discovered or should have been discovered with the exercise of due diligence, but in any event the action must be commenced within 7 years after the date the authority having jurisdiction issues a temporary certificate of occupancy, a certificate of occupancy, or a certificate of completion, or the date of abandonment of construction if not completed, whichever date is earliest.<\/p>\n<p>Special rules apply to some projects. A newly constructed single-dwelling home used as a model starts the clock on the date a deed first transferring title to another party is recorded. Each building in a multi-building project counts as its own improvement. A general rule also applies. Under <a href=\"https:\/\/www.leg.state.fl.us\/statutes\/index.cfm?App_mode=Display_Statute&amp;URL=0000-0099\/0095\/Sections\/0095.031.html\">\u00a7 95.031<\/a>, a cause of action accrues when its last element occurs.<\/p>\n<h2>The Seven-Year Outer Limit for Construction Defect Claims<\/h2>\n<p>The outer limit for construction defect claims is seven years after the earliest trigger date. This limit applies in any event. It holds even when a defect is latent and found later. When a construction action involves a latent defect, the time runs from when the defect is discovered or should have been discovered with the exercise of due diligence (<a href=\"https:\/\/www.leg.state.fl.us\/statutes\/index.cfm?App_mode=Display_Statute&amp;URL=0000-0099\/0095\/Sections\/0095.11.html\">Fla. Stat. \u00a7 95.11<\/a>). It cannot extend the outer limit.<\/p>\n<p>One rule can give extra time in a lawsuit. Under <a href=\"https:\/\/www.leg.state.fl.us\/statutes\/index.cfm?App_mode=Display_Statute&amp;URL=0000-0099\/0095\/Sections\/0095.11.html\">\u00a7 95.11<\/a>, a counterclaim, cross-claim, or third-party claim that arises out of the conduct, transaction, or occurrence set out or attempted to be set out in a pleading may be filed up to one year after the pleading it relates to is served. That applies even if the claim would otherwise be late. This can matter when a contractor or other party sues first. Waiting to see whether a warranty fix holds does not stop the clock.<\/p>\n<h2>Contract Claims, Negligence, and Other Time Limits<\/h2>\n<p>Contract and negligence claims can run on their own clocks. One project may carry several deadlines. Under <a href=\"https:\/\/www.leg.state.fl.us\/statutes\/index.cfm?App_mode=Display_Statute&amp;URL=0000-0099\/0095\/Sections\/0095.11.html\">\u00a7 95.11<\/a>, an action founded on the design, planning, or construction of an improvement to real property must be commenced within four years, with the time running from the date the authority having jurisdiction issues a temporary certificate of occupancy, a certificate of occupancy, or a certificate of completion, or the date of abandonment of construction if not completed, whichever date is earliest; when the action involves a latent defect, the time runs from the time the defect is discovered or should have been discovered with the exercise of due diligence, and in any event the action must be commenced within 7 years after that same earliest date. A professional malpractice claim other than medical malpractice, whether founded on contract or tort, is governed by a two-year period, which runs from when the cause of action is discovered or should have been discovered with the exercise of due diligence (<a href=\"https:\/\/www.leg.state.fl.us\/statutes\/index.cfm?App_mode=Display_Statute&amp;URL=0000-0099\/0095\/Sections\/0095.11.html\">Fla. Stat. \u00a7 95.11<\/a>). It runs from discovery and is limited to persons in privity with the professional.<\/p>\n<p>Under <a href=\"https:\/\/www.leg.state.fl.us\/statutes\/index.cfm?App_mode=Display_Statute&amp;URL=0000-0099\/0095\/Sections\/0095.11.html\">\u00a7 95.11<\/a>(3)(i), a fraud claim, whether legal or equitable, must be filed within four years. Section 95.031(2)(a) sets a different starting point for that period: it runs from the time the facts giving rise to the claim were discovered or should have been discovered with the exercise of due diligence, not from the general accrual date. It must still start within 12 years after the fraud was committed.<\/p>\n<p>Contracts cannot shorten the time to sue. Under <a href=\"https:\/\/www.leg.state.fl.us\/statutes\/index.cfm?App_mode=Display_Statute&amp;URL=0000-0099\/0095\/Sections\/0095.03.html\">\u00a7 95.03<\/a>, a contract term that sets a shorter filing period than the statute is void.<\/p>\n<h2>Pauses in the Clock: Tolling and Pending Arbitration<\/h2>\n<p>A pending arbitration can pause the statute of limitations in Florida. Under <a href=\"https:\/\/www.leg.state.fl.us\/statutes\/index.cfm?App_mode=Display_Statute&amp;URL=0000-0099\/0095\/Sections\/0095.051.html\">\u00a7 95.051<\/a>, the pendency of an arbitral proceeding on the same dispute tolls the time to sue. Absence from the state, or concealment in the state so that process cannot be served on the person, can also pause the clock. Those pauses do not apply if the person can be served in a way that gives the court jurisdiction.<\/p>\n<p>Other reasons do not pause the clock unless the statute lists them, such as a payment on an obligation founded on a written instrument or use of a false name that blocks service. A disability or other reason does not toll the period, except in the situations the statutes list. Plan the filing date as if no pause applies. Relying on a pause can leave a claim exposed.<\/p>\n\n<div class=\"cta-dose-mid wp-block-group has-contrast-color has-surface-background-color has-text-color has-background has-global-padding is-layout-constrained wp-container-core-group-is-layout-32197852 wp-block-group-is-layout-constrained\" style=\"background-color:var(--wp--preset--color--surface,#f2f3f5);color:var(--wp--preset--color--contrast,#22252b);border-radius:8px;padding-top:1.5rem;padding-bottom:1.5rem;padding-left:1.5rem;padding-right:1.5rem;border-left:6px solid var(--wp--preset--color--cta,currentColor);box-shadow:0 2px 10px rgba(0,0,0,0.18)\">\n<h3 class=\"wp-block-heading has-contrast-color has-text-color\">Not sure what your next step is?<\/h3><p class=\"wp-block-paragraph\">Talk it through with our team &#8212; we can walk you through how a situation like yours is usually handled and what your options are.<\/p><div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\"><div class=\"wp-block-button chg-cta-call\"><a class=\"wp-block-button__link wp-element-button\" href=\"tel:+13055702208\">Schedule a consultation<\/a><\/div><div class=\"wp-block-button chg-cta-form\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/www.lawayala.com\/contact\/\">Schedule a consultation<\/a><\/div><\/div>\n<\/div>\n\n<figure class=\"wp-block-image size-large has-custom-border\"><img decoding=\"async\" src=\"https:\/\/www.lawayala.com\/resources\/wp-content\/uploads\/2026\/10\/modern-office-building-with-a-striking-red-glass-facade-unde-photo.jpg\" alt=\"Red glass facade of a modern urban building under a clear blue sky.\" style=\"border-radius:8px;width:100%;aspect-ratio:16\/9;object-fit:cover\"\/><\/figure>\n<h2>Next Steps for Florida Business Owners and Property Owners<\/h2>\n<p>Start by collecting the dates that control the clock. Gather these items:<\/p>\n<ul>\n<li>The contract signing date and the start and completion dates<\/li>\n<li>Any certificate of occupancy, temporary certificate, or certificate of completion, with dates<\/li>\n<li>Any abandonment date, if work stopped before finishing<\/li>\n<li>Permit numbers and inspection records<\/li>\n<li>The date each defect was first noticed<\/li>\n<li>Written messages with the contractor and any warranty repair records<\/li>\n<\/ul>\n<p>Written records make the timeline easier to prove. Ayala Law PA&#8217;s office is at 1646 W Snow Ave, Tampa, Florida. If a defect, unpaid work, or breach has surfaced on your Florida project, <a href=\"https:\/\/www.lawayala.com\/contact\/\">reach out through our contact page<\/a> so the filing dates can be reviewed in time.<\/p>\n<h3>Common Questions<\/h3>\n<p>Outer limits can shorten the limitations period.<\/p><details class=\"wp-block-details chg-faq is-layout-flow wp-block-details-is-layout-flow\"><summary>Does discovering a defect restart the clock?<\/summary><p class=\"wp-block-paragraph\">For a latent defect, the time runs from when the defect is discovered or should have been discovered with the exercise of due diligence, but the action must still be commenced within 7 years after the date the authority having jurisdiction issues a temporary certificate of occupancy, a certificate of occupancy, or a certificate of completion, or the date of abandonment of construction if not completed, whichever date is earliest. The seven-year outer limit still applies.<\/p><\/details><details class=\"wp-block-details chg-faq is-layout-flow wp-block-details-is-layout-flow\"><summary>Can a contract shorten the deadline?<\/summary><p class=\"wp-block-paragraph\">No. A contract term that sets a shorter filing period than the statute is void under <a href=\"https:\/\/www.leg.state.fl.us\/statutes\/index.cfm?App_mode=Display_Statute&amp;URL=0000-0099\/0095\/Sections\/0095.03.html\">\u00a7 95.03<\/a>.<\/p><\/details><\/article>\n<footer class=\"disclaimer\"><em>Attorney advertising. The information on this page is for general informational purposes only and is not legal advice; reading it does not create an attorney-client relationship with Ayala Law PA. Prior results do not guarantee a similar outcome. Ayala Law PA, 1646 W Snow Ave, Tampa, FL 33606.<\/em><\/footer>\n\n\n<div class=\"wp-block-group alignwide has-global-padding is-layout-constrained wp-container-core-group-is-layout-583d630a wp-block-group-is-layout-constrained\" style=\"padding-top:3rem;padding-bottom:3rem;padding-left:1.5rem;padding-right:1.5rem\">\n<h2 class=\"wp-block-heading has-text-align-center\">How We Approach Construction Disputes<\/h2>\n<div class=\"wp-block-columns alignwide is-layout-flex wp-container-core-columns-is-layout-f56f613f wp-block-columns-is-layout-flex\"><div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\"><p class=\"wp-block-paragraph\"><span class=\"chg-icon chg-icon--document\"><\/span><\/p><h3 class=\"wp-block-heading\">Early Review of Your Records<\/h3><p class=\"wp-block-paragraph\">We look at the contract, change orders, payment history, lien notices and correspondence to understand where your claim stands.<\/p><\/div><div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\"><p class=\"wp-block-paragraph\"><span class=\"chg-icon chg-icon--clock\"><\/span><\/p><h3 class=\"wp-block-heading\">Attention to Timing<\/h3><p class=\"wp-block-paragraph\">Deadlines in construction matters can depend on the type of claim and the facts of each project, so timing is reviewed from the start.<\/p><\/div><div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\"><p class=\"wp-block-paragraph\"><span class=\"chg-icon chg-icon--shield\"><\/span><\/p><h3 class=\"wp-block-heading\">Practical Protection for Your Business<\/h3><p class=\"wp-block-paragraph\">We focus on protecting your payments, your license and your reputation while working toward a resolution that fits your business goals.<\/p><\/div><div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\"><p class=\"wp-block-paragraph\"><span class=\"chg-icon chg-icon--chat\"><\/span><\/p><h3 class=\"wp-block-heading\">Plain-Language Guidance<\/h3><p class=\"wp-block-paragraph\">You will receive clear explanations of your options, including litigation and arbitration, so you can make informed decisions.<\/p><\/div><\/div>\n\n<\/div>\n\n\n\n<div class=\"wp-block-group has-contrast-color has-surface-background-color has-text-color has-background has-global-padding is-layout-constrained wp-container-core-group-is-layout-32197852 wp-block-group-is-layout-constrained\" style=\"background-color:var(--wp--preset--color--surface,#f2f3f5);color:var(--wp--preset--color--contrast,#22252b);border-radius:8px;padding-top:1.5rem;padding-bottom:1.5rem;padding-left:1.5rem;padding-right:1.5rem;border-left:6px solid var(--wp--preset--color--cta,currentColor);box-shadow:0 2px 10px rgba(0,0,0,0.18)\">\n<h3 class=\"wp-block-heading has-contrast-color has-text-color\">Do Not Wait to Ask About Timing<\/h3><p class=\"wp-block-paragraph\">Construction claims can turn on dates that are easy to overlook, such as when a defect was discovered or when a project was completed. Contact our office early so the timing of your claim can be reviewed before important steps pass.<\/p><div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\"><div class=\"wp-block-button chg-cta-call\"><a class=\"wp-block-button__link wp-element-button\" href=\"tel:+13055702208\">Call (305) 570-2208<\/a><\/div><div class=\"wp-block-button chg-cta-form\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/www.lawayala.com\/contact\/\">Call (305) 570-2208<\/a><\/div><\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-group alignfull has-surface-background-color has-background has-global-padding is-layout-constrained wp-container-core-group-is-layout-583d630a wp-block-group-is-layout-constrained\" style=\"padding-top:3rem;padding-bottom:3rem;padding-left:1.5rem;padding-right:1.5rem\">\n<h2 class=\"wp-block-heading has-text-align-center\">Construction Matters We Handle<\/h2>\n<div class=\"wp-block-columns alignwide is-layout-flex wp-container-core-columns-is-layout-f56f613f wp-block-columns-is-layout-flex\"><div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\"><div class=\"wp-block-group has-base-background-color has-background is-layout-flow wp-block-group-is-layout-flow\" style=\"border-radius:8px;box-shadow:0 4px 14px rgba(0,0,0,0.08);padding-top:1.5rem;padding-bottom:1.5rem;padding-left:1.5rem;padding-right:1.5rem\"><h3 class=\"wp-block-heading\">Contractor and Subcontractor Disputes<\/h3><p class=\"wp-block-paragraph\">Payment disagreements, scope disputes, back charges and termination claims between general contractors, subcontractors and suppliers.<\/p><\/div><\/div><div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\"><div class=\"wp-block-group has-base-background-color has-background is-layout-flow wp-block-group-is-layout-flow\" style=\"border-radius:8px;box-shadow:0 4px 14px rgba(0,0,0,0.08);padding-top:1.5rem;padding-bottom:1.5rem;padding-left:1.5rem;padding-right:1.5rem\"><h3 class=\"wp-block-heading\">Lien Foreclosure<\/h3><p class=\"wp-block-paragraph\">Claims to enforce or defend against construction liens on Florida real property, including the notices and procedures that apply to them.<\/p><\/div><\/div><div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\"><div class=\"wp-block-group has-base-background-color has-background is-layout-flow wp-block-group-is-layout-flow\" style=\"border-radius:8px;box-shadow:0 4px 14px rgba(0,0,0,0.08);padding-top:1.5rem;padding-bottom:1.5rem;padding-left:1.5rem;padding-right:1.5rem\"><h3 class=\"wp-block-heading\">Construction Contract Fraud<\/h3><p class=\"wp-block-paragraph\">Claims involving misrepresented work, billing irregularities or contracts procured through false statements.<\/p><\/div><\/div><div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\"><div class=\"wp-block-group has-base-background-color has-background is-layout-flow wp-block-group-is-layout-flow\" style=\"border-radius:8px;box-shadow:0 4px 14px rgba(0,0,0,0.08);padding-top:1.5rem;padding-bottom:1.5rem;padding-left:1.5rem;padding-right:1.5rem\"><h3 class=\"wp-block-heading\">Defective Work Claims<\/h3><p class=\"wp-block-paragraph\">Disputes over construction defects, including questions about when a defect was discovered and what that means for your claim.<\/p><\/div><\/div><\/div>\n\n<\/div>\n\n\n\n<div class=\"wp-block-group alignfull has-base-color has-primary-background-color has-text-color has-background has-global-padding is-layout-constrained wp-container-core-group-is-layout-4d466591 wp-block-group-is-layout-constrained\" style=\"background-color:var(--wp--preset--color--primary,#20242e);color:var(--wp--preset--color--base,#ffffff);padding-top:3rem;padding-bottom:3rem;padding-left:1.5rem;padding-right:1.5rem\">\n<h2 class=\"wp-block-heading has-text-align-center has-base-color has-text-color\">Talk With Ayala Law PA About Your Construction Claim<\/h2>\n<div class=\"wp-block-buttons is-content-justification-center is-layout-flex wp-container-core-buttons-is-layout-0aa01211 wp-block-buttons-is-layout-flex\"><div class=\"wp-block-button chg-cta chg-cta-call\"><a class=\"wp-block-button__link wp-element-button\" href=\"tel:+13055702208\">Call (305) 570-2208<\/a><\/div><div class=\"wp-block-button chg-cta chg-cta-form\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/www.lawayala.com\/contact\/\">Call (305) 570-2208<\/a><\/div><\/div>\n<\/div>\n\n<!-- chg:section-siblings -->\n<nav aria-label=\"More in this section\">\n<h2>More in this section<\/h2>\n<ul><li><a href=\"\/resources\/resources-construction-disputes-florida-business-owners-guide\/resources-who-is-liable-construction-project-florida\/\">Who Is Liable on a Florida Construction Project: Owner, General Contractor, Subcontractor or Design Professional?<\/a><\/li><li><a href=\"\/resources\/resources-construction-disputes-florida-business-owners-guide\/commercial-construction-defect-lawsuit-florida\/\">Commercial Construction Defect Lawsuits in Florida<\/a><\/li><li><a href=\"\/resources\/resources-construction-disputes-florida-business-owners-guide\/construction-litigation-contractor-default-termination-florida\/\">Terminating a Construction Contract for Default and Replacing the Contractor in Florida<\/a><\/li><li><a href=\"\/resources\/resources-construction-disputes-florida-business-owners-guide\/construction-payment-bond-claims-florida\/\">Payment Bond Claims on Florida Construction Projects<\/a><\/li><li><a href=\"\/resources\/resources-construction-disputes-florida-business-owners-guide\/resources-construction-arbitration-clause-enforceable-florida\/\">Can a Construction Contract&#x27;s Arbitration Clause Be Enforced in Florida?<\/a><\/li><\/ul>\n<\/nav>\n<!-- \/chg:section-siblings -->","protected":false},"excerpt":{"rendered":"<p>Florida construction claims generally must be filed within four years, with a seven-year outer limit. Learn how trigger dates and pauses work.<\/p>\n","protected":false},"author":2,"featured_media":0,"parent":808,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"chg_review":"","chg_sendback":"","chg_canonical":"","chg_lang":"","chg_hreflang":"[{\"hreflang\": \"en\", \"href\": \"https:\/\/www.lawayala.com\/resources\/resources-construction-disputes-florida-business-owners-guide\/resources-statute-of-limitations-repose-construction-florida\/\"}, {\"hreflang\": \"es\", \"href\": \"https:\/\/www.lawayala.com\/resources\/es\/guia-disputas-construccion-florida-empresarios\/recursos-prescripcion-caducidad-construccion-florida\/\"}, {\"hreflang\": \"x-default\", \"href\": \"https:\/\/www.lawayala.com\/resources\/resources-construction-disputes-florida-business-owners-guide\/resources-statute-of-limitations-repose-construction-florida\/\"}]","chg_jsonld":"[{\"@id\": \"https:\/\/www.lawayala.com\/resources\/statute-of-limitations-construction-claims-florida\/#article\", \"about\": [{\"@type\": \"Thing\", \"name\": \"Contract\", \"sameAs\": \"https:\/\/en.wikipedia.org\/wiki\/Contract\"}, {\"@type\": \"Thing\", \"name\": \"Breach of contract\", \"sameAs\": \"https:\/\/en.wikipedia.org\/wiki\/Breach_of_contract\"}], \"author\": {\"name\": \"Eduardo A. Maura\", \"@type\": \"Person\", \"jobTitle\": \"Attorney\", \"url\": \"https:\/\/www.lawayala.com\/eduardo-a-maura\/\", \"worksFor\": {\"@type\": \"Organization\", \"@id\": \"https:\/\/www.lawayala.com\/resources\/#organization\", \"name\": \"Ayala Law PA\", \"url\": \"https:\/\/www.lawayala.com\/\"}}, \"@context\": \"https:\/\/schema.org\", \"audience\": {\"@type\": \"Audience\", \"audienceType\": \"Florida property owners, developers, general contractors, subcontractors, and business owners who need to know how long they have to file suit over a construction project\"}, \"headline\": \"Construction Claims and the Clock: What Florida Businesses Need to Know\", \"mentions\": [{\"@type\": \"Thing\", \"name\": \"Fraud\", \"sameAs\": \"https:\/\/en.wikipedia.org\/wiki\/Fraud\"}, {\"@type\": \"Thing\", \"name\": \"Arbitration\", \"sameAs\": \"https:\/\/en.wikipedia.org\/wiki\/Arbitration\"}, {\"@type\": \"Thing\", \"name\": \"Lawsuit\", \"sameAs\": \"https:\/\/en.wikipedia.org\/wiki\/Lawsuit\"}, {\"@type\": \"Thing\", \"name\": \"Statute of limitations\", \"sameAs\": \"https:\/\/en.wikipedia.org\/wiki\/Statute_of_limitations\"}], \"provider\": {\"@type\": \"Organization\", \"@id\": \"https:\/\/www.lawayala.com\/resources\/#organization\", \"name\": \"Ayala Law PA\", \"url\": \"https:\/\/www.lawayala.com\/\"}, \"publisher\": {\"@type\": \"Organization\", \"@id\": \"https:\/\/www.lawayala.com\/resources\/#organization\", \"name\": \"Ayala Law PA\", \"url\": \"https:\/\/www.lawayala.com\/\"}, \"speakable\": {\"@type\": \"SpeakableSpecification\", \"cssSelector\": [\"article > p:first-of-type\", \".wp-block-details p\", \"article > h1\"]}, \"areaServed\": {\"name\": \"Florida\", \"@type\": \"State\"}, \"inLanguage\": \"en-US\", \"description\": \"Explains how long a party has to file a construction defect or contract claim in Florida, distinguishing the limitations period from the statute of repose, the accrual trigger dates under Florida Statutes section 95.11, and how Chapter 558 notice affects timing.\", \"about_location\": {\"name\": \"Florida\", \"@type\": \"State\"}, \"isAccessibleForFree\": true, \"reviewedBy\": {\"@type\": \"Person\", \"name\": \"Eduardo A. Maura\", \"url\": \"https:\/\/www.lawayala.com\/eduardo-a-maura\/\", \"jobTitle\": \"Attorney\", \"worksFor\": {\"@type\": \"Organization\", \"@id\": \"https:\/\/www.lawayala.com\/resources\/#organization\", \"name\": \"Ayala Law PA\", \"url\": \"https:\/\/www.lawayala.com\/\"}}, \"mainEntity\": [{\"@type\": \"Question\", \"name\": \"Does discovering a defect restart the clock?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"For a latent defect, the time runs from when the defect is discovered or should have been discovered with the exercise of due diligence, but the action must still be commenced within 7 years after the date the authority having jurisdiction issues a temporary certificate of occupancy, a certificate of occupancy, or a certificate of completion, or the date of abandonment of construction if not completed, whichever date is earliest. The seven-year outer limit still applies.\"}}, {\"@type\": \"Question\", \"name\": \"Can a contract shorten the deadline?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"No. A contract term that sets a shorter filing period than the statute is void under \u00a7 95.03.\"}}], \"image\": \"https:\/\/www.lawayala.com\/resources\/wp-content\/uploads\/2026\/11\/half-built-commercial-office-tower-with-exposed-steel-frame-photo-2.jpg\", \"mainEntityOfPage\": \"https:\/\/www.lawayala.com\/resources\/resources-construction-disputes-florida-business-owners-guide\/resources-statute-of-limitations-repose-construction-florida\/\", \"@type\": [\"Article\", \"FAQPage\"]}, {\"@context\": \"https:\/\/schema.org\", \"@type\": \"BreadcrumbList\", \"itemListElement\": [{\"@type\": \"ListItem\", \"position\": 1, \"name\": \"Home\", \"item\": \"https:\/\/www.lawayala.com\/\"}, {\"@type\": \"ListItem\", \"position\": 2, \"name\": \"Resources Construction Disputes Florida Business Owners Guide\", \"item\": \"https:\/\/www.lawayala.com\/resources\/resources-construction-disputes-florida-business-owners-guide\/\"}, {\"@type\": \"ListItem\", \"position\": 3, \"name\": \"Resources Statute Of Limitations Repose Construction Florida\", \"item\": \"https:\/\/www.lawayala.com\/resources\/resources-construction-disputes-florida-business-owners-guide\/resources-statute-of-limitations-repose-construction-florida\/\"}]}]","chg_meta_description":"Florida construction claims generally must be filed within four years, with a seven-year outer limit. Learn how trigger dates and pauses work.","footnotes":""},"class_list":["post-7736","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.lawayala.com\/resources\/wp-json\/wp\/v2\/pages\/7736","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.lawayala.com\/resources\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.lawayala.com\/resources\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.lawayala.com\/resources\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.lawayala.com\/resources\/wp-json\/wp\/v2\/comments?post=7736"}],"version-history":[{"count":1,"href":"https:\/\/www.lawayala.com\/resources\/wp-json\/wp\/v2\/pages\/7736\/revisions"}],"predecessor-version":[{"id":7738,"href":"https:\/\/www.lawayala.com\/resources\/wp-json\/wp\/v2\/pages\/7736\/revisions\/7738"}],"up":[{"embeddable":true,"href":"https:\/\/www.lawayala.com\/resources\/wp-json\/wp\/v2\/pages\/808"}],"wp:attachment":[{"href":"https:\/\/www.lawayala.com\/resources\/wp-json\/wp\/v2\/media?parent=7736"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}